April 28, 2017
Basic Process Control System (BPCS)

Integrity Verification Questionnaire for Basic Process Control System (BPCS)

The objective of Basic Process Control System (BPCS) is to respond to signals from the process and generate output signals which ensure that the operation continues in safe state providing continuous information of the process to the operator. This article discusses the integrity verification tasks associated with BPCS.
April 28, 2017
Corrosion Monitoring and Protection System

Integrity Verification Questionnaire for Corrosion Monitoring and Protection System

The objective of Corrosion Monitoring and Protection System is to minimize internal and external corrosion rates on hydrocarbon and other critical piping systems, process components, storage tanks and structural supports. This article presents the examination scheme for Corrosion Monitoring and Protection System.
April 24, 2017
Pressure Relief Systems

Integrity Verification Questionnaire for Pressure Relief Systems

The objective of Pressure Relief system is to prevent overpressure leading to hazardous loss of containment by providing mechanical relief devices and disposal of the hazardous fluids through flare. This article presents the examination scheme for Pressure Relief.
January 6, 2017
Process Containment Integrity Verification Questionnaire

Integrity Verification Questionnaire for Process Containment

The objective of a process containing equipment is to safely contain process fluids (eg. hydrocarbons or other hazardous fluids) under 'reasonably worst case' process conditions, whilst maintaining its integrity and overall risk to as low as reasonably practicable (ALARP). This article discusses questions that need to be addressed to determine the technical and operational integrity of process containment equipment.
May 9, 2015
HSECES, Integrity, Bunduq, Bell Energy, IVB

Bunduq Oil Company awards Bell Energy contract for Independent Verification for OSII Project

http://bell-energy.com/bell-energy/wp-content/uploads/2015/05/bunduq.jpg center Bunduq Oil Company awards Bell Energy, IVB Services contract for OSII Project HSECES Independent Verification Body for the OSII Project: Bell Energy completed Independent Verification of all the HSE Critical Equipment and Systems (HSECES) during the FEED and EPC phase of the project. The verification activities included documentation review for structural, mechanical, process, piping, HSE, loss prevention, corrosion, electrical and instrumentation disciplines. As part of the IVB process, Bell Energy performed an independent Third Party audit of HSECES Integrity Management System and HSE Management System. The project was performed over a period of 2 years and included several stages of verification. Project Deliverables: Bell Energy delivered the following as part of the Independent Verification service: Audit the process of identification of HSECES Audit the process of development of HSECES Performance Standards Development of a Verification Plan for the project activities Development of Written Scheme of Examination Performing Document Examination Performing Audit on the HSECES Integrity Management System and HSE Management System Development a Non Conformance Risk Register Client: Bunduq Company Limited was established in December 1970 to develop the offshore El Bunduq oil field which is located on the border of the Emirate of Abu Dhabi and State […]